Showing posts with label Product Owner. Show all posts
Showing posts with label Product Owner. Show all posts

Friday, September 2, 2011

SM / PO Cheatsheet: Simple guide to the difference between a Scrum Master and a Product Owner

By Edward Scotcher

This is a simple one page aide memoire that can be used to help explain the responsibilities of the role of Product Owner and Scrum Master. It's great to print off and hand out to people when you are explaining what the roles are and what the differences are between them. So next time you need to talk about these roles, you can use this as a basis for a simple discussion or presentation.

Scrum Master's Responsibilities

  • Responsible for helping the team deliver work to the Product Owner
  • Makes sure the team can meet its commitments by removing any impediments they face, including Managing dependencies, escalating blockers that they cannot remove themselves
  • Facilitates process & meetings (eg Reviews, Stand Ups, Planning, Estimation, Scheduling, Prioritization)
  • Makes sure the team is fully functional, productive and improving quality
  • Shields the team from distractions and interferences (including the Product Owner)
  • Enables close co-operation across all roles and functions, removes barriers
  • Responsible for reporting progress, including producing standard outward-facing artefacts
  • Manages Product Owners expectations of the team
  • Responsible for keeping time and quality requirements

Continue reading this article.

Friday, August 26, 2011

How PD works in Agile team

By Dingshan Li

PD (Product designer) is very important role in software development. They will provide detail requirements specification and business workflow, UI workflow. In traditional software development process, PD will prepare the detail requirement design document before develop team start to make software design. This kind of process will work pretty well if the requirements are clear and relatively stable. Also, there are enough PD resources to make the complex documents. But most of time, we cannot figure out the whole requirements clearly at the start stage. And the scope change is often happen. Another factor is that PD always need to work on more than one product and it is very difficult for them to spend much of time to work out a detail design document. So, what can we do to deal with this kind of issues?

Agile provides a methodology or framework for the team to develop software under the situation of changing scope. By focusing on high value requirement, separating the long lifecycle to be several short iterations and guarantee fully-test in each iteration, it can provide high-quality and expected software to the client. In this kind of framework, how PD works in the team? How they collaborate with others

Continue reading this article.

Friday, August 19, 2011

The Product Owner on One Page: Overview of the Product Owner Role

By Roman Pichler

The following diagram summarises the product owner's responsibility together with the role's key activities and artefacts.

The Product Owner on One Page

Continue reading this article.

Friday, July 29, 2011

Ouija Board Estimation

During a recent training course I ran, one of the delegates made a joke about the nature of agile estimation in Scrum teams resembling a "séance"; whereby the team gathers around the table and stares at a number of user story cards expecting something unnatural to happen. How true!  This gave me an idea for a different type of iterative estimation that I tried in practice with ‘Team Woodstock’.  I sat the team around a table and wrote the Fibonacci sequence’s numbers “1,2,3,5,8,13” and a “?” on post-its around the table in the design of a Ouija board.  Once everyone was sitting comfortably, had cleared their minds and entered a trance-like state the product owner read out the story and the team clarified the acceptance criteria.  Then the story was placed in the middle of the table and each team member put one finger on the story – in silence. Without discussion or argument the story started to move towards the number which reflected its size, by the act of the team members pushing or pulling the story towards their chosen number.

Online Scrum Tool

Continue reading this article.

Friday, June 24, 2011

An Example ScrumMaster's Checklist

By Michael James

An adequate ScrumMaster can handle two or three teams at a time. If you're content to limit your role to organizing meetings, enforcing timeboxes, and responding to the impediments people explicitly report, you can get by with part time attention to this role. The team will probably still exceed the baseline, pre-Scrum expectation at your organization, and probably nothing catastrophic will happen.

But if you can envision a team that has a great time accomplishing things you didn't previously consider possible, within a transformed organization -- consider being a great ScrumMaster.

A great ScrumMaster can handle one team at a time.

We recommend one dedicated ScrumMaster per team of about seven, especially when starting out.

If you haven't discovered all the work there is to do, tune in to your Product Owner, your team, your team's engineering practices, and the organization outside your team. While there's no single prescription, I've outlined some things I've seen ScrumMasters overlook.

Continue reading this article.

Monday, June 20, 2011

Ouija Board Estimation: A fun technique for agile estimating

By Paul Goddard

During a recent training course I ran, one of the delegates made a joke about the nature of agile estimation in Scrum teams resembling a "séance"; whereby the team gathers around the table and stares at a number of user story cards expecting something unnatural to happen. How true!  This gave me an idea for a different type of iterative estimation that I tried in practice with ‘Team Woodstock’.  I sat the team around a table and wrote the Fibonacci sequence’s numbers “1,2,3,5,8,13” and a “?” on post-its around the table in the design of a Ouija board.  Once everyone was sitting comfortably, had cleared their minds and entered a trance-like state the product owner read out the story and the team clarified the acceptance criteria.  Then the story was placed in the middle of the table and each team member put one finger on the story – in silence. Without discussion or argument the story started to move towards the number which reflected its size, by the act of the team members pushing or pulling the story towards their chosen number.

Scrum Tool

Continue reading this article.

Friday, June 17, 2011

Why Your Boss's Boss Should Also Go Agile

By Christine Crandell

Incremental software development methodologies can be traced all the way back to the 1950s, but it wasn’t until 2001 that “The Agile Manifesto” created a comprehensive and landmark account of agile development and why it’s a better, lighter approach to creating software faster.

Ever since then, developers have been using agile methodologies to improve the speed and flexibility of software development through operational improvements, but most other groups within the same company have not adopted a similar philosophy.

Conceptually we’ve bottled up agile as being for software developers, as if speed, flexibility, and complexity weren’t also issues held within every other departments of fast-paced software companies. When software developers are using agile methodologies, but nobody else is, developers become like the clique group of school kids who share a foreign language nobody else understands.

This has caused us to limit the potential for agile frameworks, because they're only implemented operationally, but not strategically. It’s like a wooden boat full of rowers. They might have seamless coordination and full visibility into the work of their colleagues, but they can’t see the captain’s orders up on deck.

Continue reading this article.

Thursday, June 9, 2011

Have an Initial Conversation to Start an Agile Project: A CSP and CSM share how teams at Baker Hughes choose the solution delivery methodology that best suits the project.

By Rahul Sawhney and Prashant Patel

The Baker Hughes Product Development Lifecycle starts with discovery and inception phases. The delivery teams start engaging with the customers during the inception stage. By the end of inception, business requirements are understood at a high level and stakeholders from different teams who will be involved in the project are identified. This is when discussions are held for selecting the appropriate solution delivery methodology.

The choice of methodology impacts how the different stakeholders engage with the project. We have seen that in order to improve the chances of success for any project, the solution delivery methodology and the level of commitment needed should be understood upfront by all stakeholders. To that end, it is important that there is representation from multiple stakeholders, including but not limited to business, development, testing, agile coach, project management and resource management.

The stakeholders should be aware of the agile methodology and scrum framework for having this conversation. It is beneficial if they understand the rigor agile brings with respect to solution delivery and how it is different from waterfall.

Continue reading this article.

Sunday, May 22, 2011

Owning an Agile Product: One CSPO's Experiences Driving Scrum Projects.

By Edward Wehr

Being a product owner and having responsibility for a product's development using agile methods can be a bit overwhelming. Creating any product can be challenge. With a product being developed at the speed of agility, these challenges increase. Nothing is more frightening than feeling out of control while going at a high rate of speed. Let me reassure you, though, that it does get better. The first time you drive down that agile highway (even if you aren't yet going fast enough), it's scary. But with practice and a good understanding of what to watch for, driving an agile project becomes easier.

Because training and certification for product owners is fairly new, I've included some wisdom I've gained from my time on the agile road, which includes guiding four different teams over the past several years.

Priorities Are Priority One.

What teams need most is a product owner who is able to prioritize the product backlog. This includes adjusting priority based on new information and juggling the team's needs for work against customer features. A product owner must understand and be willing to have the critical conversations with team members regarding stories (work) that are not direct customer features, yet will develop an architecture that will enable the team to achieve more work (higher velocity) in the future. Balancing all of these competing stories, and the emerging importance and changing priorities that come with them, is a constant struggle.

Continue reading this article.

Sunday, May 8, 2011

Go with the Workflow: Focus on process instead of definitions to help new teams deal with product backlog items

By Henri Stegehuis

I love my work. Implementing Scrum is fantastic. Every company I work with has different processes and cultures. Coaching teams in this drastic new approach we call Scrum is always fun (afterwards). Working with people, breaking traditional patterns in common sense, creating a physical/visible presence, and fostering honest communication is a roller-coaster experience. Every team is unique, every time surprising me with interesting reactions and sometimes unexpected results.

In the past, some of these unexpected results have sprung from my attempts to explain the concept of a product backlog item (PBI). For teams raised in traditional development, the ins and outs of product backlog items can be difficult to grasp. When I talked with these teams about PBIs, I made the mistake of going into too much detail too early. I would start with the definition, explaining that a PBI is "up to half of an A4 page describing a requested feature from a market point of view." This, while a correct description, opened the floodgates for the skeptics and perfectionists within the team, who asserted that there was no way they could write a complete product backlog item in that amount of space. We would get off track, and it would take me some time before I could refocus the team.

Continue reading this article.

Tuesday, May 3, 2011

Effective Retrospectives & Reviews: A CSP’s perspective on continuously improving both the process and the product.

By Marco Mulder

Continuous improvement is a key principle of Scrum. Yet, though most Scrum teams conduct a sprint review and a retrospective at the end of each sprint, too many teams fail to implement the improvements they identify. In my experience, there are two common causes for this:

  • Teams don’t have or maintain explicit standards for their product and process;
  • Teams don't use the product backlog to schedule improvements.

Set a Dynamic Standard

A definition of done in Scrum defines general acceptance criteria to which all implemented features should adhere. This ensures that everyone has the same understanding of what it means for a feature to be “done.” Team members must all know these general acceptance criteria so that they know when they’re finished. The product owner and stakeholders need a definition of done so that they know what they can expect from the features delivered by the team. That does not mean, however, that the initial definition of done is the one you will want to use throughout the project's lifecycle. In fact, one of the reasons why an explicit definition of done is important is that it not only says what will be included in each feature, it also makes explicit what is not included. Some of the things not included may be planned additions later in the project.

Continue reading this article.

Sunday, May 1, 2011

Agile Coaching Qualities, from A to Z

By Sunil Upadhye

Successful ScrumMasters and agile coaches share many positive qualities—listed here from A&A to Z&Z.

Attitude & Affirmations

Dress up your attitude and you can achieve 100 percent success. Affirmation is a self talk – whatever you say to yourself will be reflected in your behavior. Be kind to yourself and nice things will happen.

Balance & Benchmark

Create a balance in your mind. Be unshakable in the war against Naya – No Sayers. Create a benchmark of your work today. track the progress of your team through constant feedback mechanism.

Courage & Collaboration

Only courage can create highly collaborative team.

Determination & Desire

Have a strong determination to make others successful. Desire success. Look for the good in everyone. You will find excellent things in every human being.

Continue reading this article.

Friday, April 29, 2011

Common Product Owner Traps

By Roman Pichler

Product owners play a key part in creating successful products with Scrum: They are in charge of the product and lead the development effort. But this new, multi-faceted role can be challenging to apply. For many organizations, the path to effective product ownership is littered with traps and pitfalls. This article helps you recognize and avoid some of the most common traps.

Editor's Note: The following article was originally published by InformIT and borrows heavily from the author's latest book. It is included here for your convenience and with permission.

The Product Owner in Scrum

“The Product Owner is the one and only person responsible for managing the Product Backlog and ensuring the value of the work the team performs. This person maintains the Product Backlog and ensures that it is visible to everyone,” writes Ken Schwaber in the Scrum Guide (Feb 2010 edition, p. 7). This definition sounds rather harmless until we consider its implications. It requires the product owner to lead product discovery, to help identify and describe requirements, and to make sure that the product backlog is ready for the next sprint planning meeting. It also means that the product owner has to engage in product planning, visioning and product road mapping. The individual decides on the content of a release, carries out release planning, reviews work results and provides feedback to the team, and manages customers, users and other stakeholders. So many diverse responsibilities make the product owner a multi-faceted and challenging role. What’s more, the product owner duties often cut across existing roles including the product marketer, product manager and project manager roles. It’s not surprising that organizations can find it challenging to apply this new role encountering traps and pitfalls along the way. Let’s have a look at some of the most common ones.

Continue reading this article.

Thursday, April 21, 2011

How to Sustain Adaptive Planning

By Rahul Sawhney

Scrum and other agile methods recognize that responsiveness to change is an important aspect of delivering projects. They also recognize that software development is evolutionary and creative. By managing changes through Adaptive planning, Scrum provides a simple yet effective method of planning and tracking project progress. In this article, we will examine what is needed to sustain Adaptive planning and improve Team's responsiveness towards customer needs.

We will examine the following factors:

  • Just-enough planning
  • Evolving plan, scope driven by budget and/or time
  • Grooming the scope
  • Trust, involvement and collaboration
  • Management support

Consider a scenario where the project is progressing as per plan, and in the middle of the project the customer approaches project manager with a request:

Customer: "I really need this functionality delivered in the project. But it is not part of the current scope. Can we make it happen as part of this project?"

Possible response #1:

Project Manager: "Unless you are okay with budget overflow and/or schedule delay. Alternatively, we can revisit the project scope but it will require us to drop certain other functionality from the scope of this project. As the effort already spent on estimation and analysis of that functionality will be wasted, please be aware that it will impact productivity."

Possible response #2:

Project Manager: "Well, I am afraid the change control board (CCB) needs to decide this. The CCB meets in two weeks and once they approve that an investigation is needed, we can investigate and inform them about the impact on our plan. The CCB can then decide whether or not this functionality can be implemented."

Possible response #3:

Project Manager/Product Owner: "I do not see a problem as long as you are okay with dropping certain low priority items from current scope of the project and getting this functionality at the end of next Sprint, assuming it fits. Let's get together and discuss."

Although many responses are possible depending on the context, if the project is using Adaptive planning then a response similar to response #3 is more likely. Such a response demonstrates that the Team is well prepared to respond to change.

Making Adaptive planning work

- Just-enough planning

Free scrum tool

To begin with, requirements are understood at a very high level and thereafter, the rest of the planning is driven by priority. As a rule, lesser time is spent on figuring out the details of those requirements that do not have a very high priority. High priority bigger requirements are split into smaller ones so that details can be explored. Only relative size estimates (at a high level) are done at this point to get an idea of how "big" the work is. Once the work is quantified, tasks and effort are estimated for the highest priority requirements. That gives an idea of how much the Team can deliver in a Sprint. This idea is tested in the first Sprint and gives the Team a better understanding of its Velocity (or the size it can deliver in one Sprint). Using the Velocity, the Team is now in a better position to give commitments for later sprints.

- Evolving plan, scope driven by budget and/or time

Scrum tool

As the project gets underway and the Team executes multiple sprints, the Team has better visibility on the customer needs. Likewise, the customer also understands the requirements better. This understanding results in evolution of the Product Backlog (e.g. changes in functionality and scope, priority).

As the Product Backlog evolves, the size estimates are done for newly added requirements. The Product burndown chart shows how much work is remaining based on the revised scope in the Product Backlog. The work remaining is controlled usually by removing some low priority requirements (of size equal to the added requirements) from the scope. This ensures that scope is managed continuously based on highest priority requirements.

Adapting the plan in this manner helps in providing better visibility to all stakeholders by tackling many important issues, such as:

  • How do we deliver what is most important for the customers?
  • How do we address customer feedback on what has been already delivered?
  • What are the key changes that we need to make?
  • Have we addressed all the key risks for the project?
  • How much work is remaining for the project? Do we need to adjust the project scope?

- Grooming the scope

At the beginning of each Sprint, the Team makes a commitment on the functionality it can deliver. In order to make a commitment, the Team may need some time to investigate certain aspects and risks in the preceding Sprint itself. In other words, sometimes it makes sense to look-ahead and reserve some time for investigation on risky items in the backlog that may be part of the next Sprint. Better insight into risky items in the Product Backlog helps the Product Owner make conscious decision on the item's priority, makes the Sprint planning exercise easier and the Team more confident.

Additionally, new functionality requests by Customers can be expected at any point during the project. Sometimes, especially when the functionality is complex or due to other reasons, identifying enough details for quickly giving commitments on these new items at the beginning of the Sprint can be difficult. Grooming the scope during a previous Sprint makes sense.

- Trust, involvement and collaboration

Working with an adaptive plan requires a lot of trust, involvement and collaboration between the Team, the Product Owner and other key stakeholders of the project. Unfortunately this is much easier said than done. Individual stakeholders have different motivating factors and it requires time to build the trust.

Things may become extremely difficult and unsustainable if the trust is lost. The effect of losing trust could result in failures such as poor quality, dramatically reduced velocity, inability to meet commitments for multiple Sprints, arguments over small stuff, high team attrition and loss of face in front of the customers.

Building trust requires a lot of commitment and collaboration. The Product Owner and management should give the Team freedom to decide how much it can deliver in a Sprint. The Product Owner needs to set the right expectations between the customers and the Team. Setting unreasonable expectations can misfire in the long term. The Team may succumb to pressure of delivering more functionality and may succeed in doing so by cutting quality, or by introducing too much technical debt that becomes difficult to handle later. The ScrumMaster needs to support the Team by guarding the scope and the practices of Scrum. The Team needs to understand the needs of the Product Owner and help in achieving that goal. The Team can help in several ways, such as improving its engineering practices, making the most out of feedback, ensuring that it acts on its retrospective actions and highlights issues that are beyond control.

The mechanism of "inspect and adapt" should not be interpreted as a "self-repairing system." The system will not fix the problems unless everyone involved in the process devotes the time needed and is committed to the process. The Team members (ScrumMaster, developers, testers etc.) need to work with each other to achieve the Team's sprint goal and continuously improve their ways of working. They need to work with the Product Owner to groom the scope and understand what is needed.

Likewise, the Product Owner needs to collaborate with the Team throughout. If the Product Owner becomes complacent in engaging with the Team after a few Sprints then the visibility of the Team can reduce drastically, benefits achieved can be quickly erased and situation can deteriorate. The Product Owner needs to ensure that the business users and customers are appropriately engaged in the process. Without an appropriate level of engagement, there is a risk of misunderstanding the business and customer needs.

- Management support

In order to sustain Adaptive planning with Scrum, it becomes important that the culture of the organization understands and respects change. Organizations, where teams go agile but the management thinking does not, run a risk of quickly losing all the benefits from Agile and becoming worse than they were before. Some of the things that managements need to do include

  • Provide long term vision, direction and priorities
  • Trust and motivate their Teams
  • Focus on addition of business value
  • Encourage Teams to deliver quality, act on technical debt, enhance engineering practices
  • Ensure continuous flow of work
  • Minimize non-work related disruptions
  • Facilitate removal of impediments outside the control of Teams
  • Support the process of learning, inspecting and adapting
  • Communicate

Conclusion

Adaptive planning helps Teams handle changes to scope in a continuous manner but may become unsustainable when practiced in isolation. Other practices of Scrum, along with critical management support and understanding are critical for sustain Scrum in an organization.

Monday, April 18, 2011

Can Scrum Support Six Sigma?

By Heitor Roriz Filho

INTRODUCTION

This article discusses briefly how Scrum could support Six Sigma projects. Issues of whether Six Sigma is used specifically in software or other product development are not considered. If you ask yourself "Why should Scrum support Six Sigma projects?" I can promptly reply, "Why not?"

Moreover, the question of how Scrum, a lightweight framework for project management and other predictive and detailed methodology have led to process improvement has already been addressed in [2] [3] [4] [7].

SIX SIGMA ASPECTS OVERVIEW

Six Sigma can be considered a detailed and structured methodology to execute projects in a company. To ensure the success of Six Sigma methodology implementation, some critical factors must be verified. A study by McAdam and Lafferty reveals the necessity of employer's empowerment applied with the right tools and methods, in order to achieve the Six Sigma proposed goals in an autonomous and responsible way [14].

Six Sigma as a new paradigm of excellence can result in a huge amount of investment, and it can be questioned if there are other methods that require fewer resources and achieve similar results. Six Sigma still has a long road ahead until it can be accepted as a change philosophy applied to companies in general [14].

In parallel to this movement, another methodology called Lean Manufacturing or Lean Production was developed, and the union of these two process improvement methodologies is called Lean Six Sigma. Originally focused on improvement with a special attention to losses reduction, the concept became one of the most important points of Taiichi Ohno's philosophy, the mentor of the Toyota Production System (TPS). Combining JIT, KANBAN, Quality Circles and CEP, he focused on saving Toyota from a big crisis during the 50´s, which they not only overcame but also won the Japanese Quality Award, the Deming Prize.

Nowadays, many consulting companies look for Six Sigma experts as well as experts in Program and Lean Production, and even though training costs remain above average, many companies are still embracing these programs. On the other hand, some online communities such as TreQna (www.treqna.com) are freely sharing Six Sigma and Lean Production concepts, ensuring many options to people interested on acquiring such knowledge.

The deployment of any program or strategy always depends on people's behavior. In [18] this behavior is divided into two independent and important groups, the top management and the people in charge of the program implementation. The behavior of these two groups is strongly related to their creeds and values, and significantly contributes to the implementation success of a process improvement program such as Six Sigma.

SIX SIGMA ROLES AND METHOD

Six Sigma is based on a people structure of three main roles, Champions, Black Belts, and Green Belts working in a framework such as DMAIC (Define-Measure-Analyze-Improve-Control), a 5-phase method based on PDCA and focused on problem-solving. The Champions have the responsibility to properly define the project scope (during the Define phase) and support the project during the other phases. The Black Belt has the responsibility to communicate frequently with Champions and team members during the project execution, and act as a project leader. Green Belts act as team members and play an active role in the Measure, Analyze, and Improve phases. Finally, all members work together to ensure the sustainability of improvements during the Control phase.

THE SCRUM ROLES

Scrum is focused on its process, three roles, and some artifacts. The three roles in Scrum are the Product Owner, the ScrumMaster, and the Scrum Team.

The artifacts in Scrum are the Product Backlog, the Sprint Backlog, and the Burndown Graph. The Product Backlog contains a prioritized list of the client's needs, i.e., all activities to be performed in order to get the product done. This list is prioritized according to the client necessities; the more business value, the higher on the list the activity will be placed. The Sprint Backlog is a list of activities broken into tasks that are selected in the beginning of a Sprint (a time-boxed iteration usually ranging from two to four weeks). A Burndown Graph displays the remaining work in a Sprint. The literature about Scrum artifacts is vast. More on the artifacts can be found at [10] [11] [12].

The Product Owner (PO) has several responsibilities in a project ranging from defining the product vision to managing the Return on Investment (ROI). The PO represents the needs of the client in a project and is in constant and close contact with the client as well as with the Scrum Team and ScrumMaster. The ScrumMaster is a facilitator in the Scrum process. He is the one responsible for ensuring that Scrum is correctly understood and is correctly followed by the team and PO. The Scrum Team is comprised by those who actually perform the activities necessary to get the product done during the several Sprints.

The Product Owner builds the Product Backlog, a prioritized list of the client's needs. These needs are expressed and/or written in the form of User Stories [14]. Before starting a Sprint, the Scrum Team, the ScrumMaster and the Product Owner perform the planning in a ceremony called the Sprint Planning Meeting. During this meeting the stories with higher priorities are thoroughly discussed and understood by all involved in the process. The Scrum Team then takes these stories and breaks them down into activities, which are the tasks needed to be performed in order to get each story done. These activities comprise the Sprint Backlog.

With the Sprint Backlog the Scrum Team starts to perform in the Sprint. During each day of the Sprint, the Daily Scrum takes place. During this 15-minute standup meeting, each member of the team answers three questions: What did I do yesterday? What I am going to do today? Are there any impediments? It is important to point out that the ScrumMaster acts as a facilitator during the whole process. During the Sprint he will be the one responsible to check whether the Scrum Process is being correctly followed and will protect the team from external interferences, including facilitating the removal of all possible impediments for the tasks.

At the end of the Sprint an increment of the product is delivered. Two ceremonies are performed, the Sprint Review, where the potentially deliverable product increment shall be accepted by the Product Owner, and the Sprint Retrospective, where the team discusses improvements that can be done during the next Sprint. These improvements range from changes in artifacts to better personal interaction.

We can see in this section that Scrum has a very simple yet immutable core process. It is important that this remains unchanged; otherwise we will not be speaking about Scrum, but something else. The next section will talk about how to blend this Scrum kernel into Six Sigma's.

BLENDING SCRUM INTO DMAIC

Scrum is extremely critical regarding the pureness of its architecture while Six Sigma is focused on reaching high quality products performance through variation reduction. The combination of these two concepts can be extremely powerful to bottom-line applications, mainly because Scrum has a strong alignment with lean principles. Furthermore, Six Sigma implementations blended with Lean principles (Lean Six Sigma) can be found in the industry and have become subject to many studies. We believe this diversity ranging from Lean and behavioral aspects and thoughts to predictive and detailed ideas can lead to better performance [5]. As pointed out by [15], Six Sigma should not focus only on the "how to do" the continuous improvement, evaluating the processes performance and business results, but also verify the people engagement and motivation. Therefore, both concepts can combine and complement each other, improving results.

Focusing on high quality products performance and establishing metrics based on statistics, Six Sigma manages a strong, continuous improvement of the manufacturing process. On the other hand, Scrum is a people-centered approach. Its essence surrounds its process and it has a profound effect on people's behavior: it affects the level of commitment in projects tending to facilitate the adoption of new ideas, i.e., it fights the resistance to change.

I start by grouping Six Sigma in six perspectives as shown in Figure 1 below.

Free Scrum Tool

The focus on clients' perspective aims to determine the VOC (Voice of Client) variable. Scrum has a very strong focus on the client. The client has its voice through the role of the Product Owner, which acts as a proxy of the client and communicates to the Scrum Team her vision and goals in the scope of the project. The fourth perspective is strongly based on statistical measurements. While Scrum has no predefined statistics in its core, it does aim to achieve improvement through collaboration and communication, i.e., developing strong and fruitful interactions among people. For these two perspectives it does not matter what process tool is used: DFSS, DMAIC, DMADV, etc.

DMAIC is one of the tools found in the perspective number 3 above. The steps defined by DMAIC is where Scrum can produce more tangible results and establish how both concepts intermingle as this is where project management initiatives in Six Sigma are located.

In order to apply Scrum in a Six Sigma project, we propose the following correlation among the roles of both concepts, shown in Figure 2 below.

Scrum Management Tool

One of the common mistakes that organizations make when implementing statistical thinking as in Six Sigma implementations is using measurement for motivational purposes [6]. Scrum as a PM framework can collaborate with Six Sigma leveraging the commitment of the team in both Operational and Managerial levels as depicted in Figure 3 below.

In order to blend Scrum and Six Sigma concepts, we consider that an organization comprises two parts, namely the managerial and operational level. We can then visualize the enterprise in terms of project management, where in the managerial level we find all types of executive work, except project management itself. Project management activities can be found in the operational level.

In the managerial level, Scrum would leverage the premise of any Six Sigma implementation, i.e., the support of senior executives. Applied to this level one can setup business-specific Sprint and Product Backlogs and run their activities according to Scrum's Heart and Soul [11]. This approach has been termed Executive Scrum by Magno [8].

Scrum tool

The operational level is where DMAIC comes into play. Defining, measuring, analyzing, improving, and controlling are done during project execution. Champions (executive board) determine priority of upcoming tasks according the last DMAIC cycle. This prioritization comprises the Sprint Backlog for one Sprint.

CRITICAL ASPECTS TO CONSIDER

Six Sigma's VOC is a critical aspect of the methodology. This is generally not considered as much as it should be in any Six Sigma implementation. Deming's system of profound knowledge has four points [16]:

1. Appreciate the system.
2. Understand variation.
3. Theory of knowledge: PDCA as constant improvement.
4. Psychology. In our case, understand what engages people in their work.

Generally, Six Sigma is seen as being focused mostly on points 2 and 3. The point is that it does not matter how precise or improved a process can be if it does not meet the client's needs. Points 1 and 4 of Deming's system are those that interface with client's needs. This is where Scrum comes into play, as it has a strong focus on this and aims to work in collaboration with clients during every Sprint.

REFERENCES

[1] H. TAKEUCHI AND I. NONAKA, The New New Product Development Game, Harvard Business Review, 1986.

[2] JAKOBSEN, C. R. AND SUTHERLAND, J. Scrum And CMMI – Going From Good To Great. Are You Ready-Ready To Be Done-Done? In Agile 2009, Chicago, 2009.

[3] SUTHERLAND, J. ET AL. Scrum and CMMI Level 5: The Magic Potion For Code Warriors. In Agile 2007. IEEE Computer Society.

[4] GLAZER, H. ET AL. CMMI Or Agile: Why Not Embrace Both! Software Engineering Institute, Carnegie Mellon University. November 2008, Technical Note Cmu/Sei-2008-Tn-003.

[5] PAGE, S. The Difference: How the Power of Diversity Creates Better Groups, Firms, Schools, and Societies. Princeton University Press, 2007.

[6] PAULK, M. C. AND HYDER, E. B. Common Pitfalls in Statistical Thinking. Carnegie Mellon University. In ASQ SOFTWARE QUALITY PROFESSIONAL, VOL. 9, NO. 3, JUNE 2007, PP. 12-19.

[7] PAULK, M. C., Extreme Programming from a CMM Perspective. IEEE Software, Vol. 18, No. 6, November/December 2001, pp. 19-26.

[8] MAGNO, A. Scrum Executivo. AdaptWorks, São Paulo, 2007.

[9] SIVIY, J. M. AND FORRESTER, E. C. Accelerating CMMI Adoption Using Six Sigma. Carnegie Mellon University, Software Engineering Institute, 2004.

[10] SCHWABER, K. The Enterprise and Scrum. Microsoft Press, 2007.

[11] SCHWABER, K. Agile Project Management with Scrum. Microsoft Press, 2007.

[12] SCHWABER, K. AND BEEDLE, M. Agile Software Development with Scrum. Prentice Hall, 2001.

[13] http://www.scrumalliance.org. Scrum Alliance website.

[14] COHN, M. User Stories Applied.

[15] MCADAM, R. and B. LAFFERTY, A multilevel case study critique of six sigma: statistical control or strategic change? International Journal of Operations & Production Management, 2004. p. 530-549.

[16] http://deming.org/index.cfm?content=66. The W. Edward Deming Institute. Accessed: 2010-01-29.

[17] CORONADO, R.B. and J. ANTONY, Critical success factors for the successful implementation of six sigma projects in organizations. The TQM Magazine, 2002. p. 92-99.

[18] PFEIFER, T., W. REISSIGER, and C. CANALES, Integrating six sigma with quality management systems. The TQM magazine, 2004. pp. 241-249.

Saturday, April 16, 2011

What does a ScrumMaster do?

By Dr. German Sakaryan

As a ScrumMaster, I was asked this question many times. Sometimes I had enough time to explain, sometimes not. But every time it was challenging to provide a clear picture of what a ScrumMaster really does.

To help myself and other ScrumMasters, I have started to write down general activities, which characterize the role of the ScrumMaster (see below).

The priority of activities varies by company.

  1. Keeps Scrum process running
  2. Ensures a proper power balance between PO, Team, Management
  3. Protects the Team
  4. Moderates in the Team
  5. Helps to organize (e.g., Meetings)
  6. Helps to keep the Team focused on the current Sprint
  7. Helps to achieve Sprint goals
  8. Works with PO
  9. Educates PO, Team, Management and Organization
  10. Solves impediments
  11. Encourages and helps to achieve transparency
  12. Strives to develop a Team into a High Performance Team
  13. Encourages and protects self-organization
  14. Educates and focuses a Team toward business-driven development
  15. Supports Team building and Team development by utilizing the abilities and skills of individuals, and fostering a Feedback culture
  16. Helps to self-help
  17. Ensures and supports Empowerment of the Team
  18. Addresses needs efficiently and effectively
  19. Detects hidden problems and strives to solve them
  20. Helps Team to learn from its experiences

Hints for management:

ScrumMaster is a very challenging job. If you are hiring someone for the position, consider which skills the ideal candidate would have.

In my opinion, the job profile is strongly oriented towards leadership and soft skills including moderation, facilitation, presentation, communication and conflict management, and less technically-oriented.

Tuesday, April 12, 2011

Transitioning to Scrum: Selecting the Product Owner

By John Clifford

Many teams moving to Scrum have questions about the Product Owner position. Is the Product Owner a member of the Scrum team? What role does the Product Owner play in the day-to-day life of a Scrum project? How do we map current functional roles to Scrum roles, specifically with regard to the Product Owner? Who should we select as our Product Owner?

Let me start by saying the Product Owner is perhaps the most important role in Scrum, something you don't often hear from Scrum folks. The Scrum process defines the Product Owner as being the person responsible for the team's return on investment, i.e., the Product Owner will be judged by whether the project's outcome justifies its cost. Another, more direct way of saying this is to identify the Product Owner as "The Single Wring-able Neck," or the person whose head is on the figurative chopping block if the project fails. Interestingly, the Project Management Institute has a similar definition for project managers: the person assigned by the performing organization to achieve the project objectives (PMBOK Guide, 4th Edition, p13). Therefore, based upon both the Scrum and PMI definition, the Product Owner responsibilities are equivalent to those of a project manager. This is one reason why I have found knowledge and competence in project management to be a key ability of a successful Product Owner. Selecting a Product Owner therefore naturally starts with identifying candidates who have that knowledge.

There are other skills and abilities required, including sufficient technical knowledge to understand the problem domain and the technical aspects of proposed solutions. A successful Product Owner doesn't need to be the best software developer on the team, but he does need to be able to understand the technical decisions well enough to know whether they make sense. Eliminate candidates who lack sufficient technical ability.

Be especially careful not to view the Product Owner as the project's 'driver.' Scrum is about empowered, self-managing teams that are led (pulled) rather than driven (pushed). Scrum means never having to be driven. Candidates who can't or won't embrace the servant-manager philosophy, or who insist on directing the team should be disqualified. Nothing will cripple your Scrum implementation more than ade jure Product Owner who sees himself as a de facto team manager.

By now, you should have narrowed the candidate list to those who have demonstrable technical, project management, and interpersonal skills. Who among the remaining candidates has the ability to understand the customer, the market, and the business? Are there candidates with entrepreneurial experience? Owning a business, starting a business, or working in a leadership position at a startup where everyone wears a multitude of hats and understands making money is the true test of whether or not the customer is satisfied is invaluable. People with this experience understand what really matters because they've lived it. People who have had experience in customer support, QA/test, or sales and marketing at larger companies may also have an understanding of the customer.

Now you should be down to the final few candidates. I like the Toyota Production System concept of a 'Chief Engineer' with extensive technical, project management, and business knowledge who leads the team to successful project completion. We're talking about candidates with a software development background and successful project management experience, who have dealt effectively with the customer and understand business realities, and have the skills and experience to successfully act as a proxy for the customer and other stakeholders. Which of the remaining candidates most closely matches this description? If there is no one, have any of the candidates shown promise that they can develop to this level? If the answer is still "no," then you may want to hire someone with the necessary talents and skills to fill the position.

Saturday, April 2, 2011

Requirement analysis and Design flow in Scrum

By Yi Lv

When do requirement analysis and design activities happen in the Scrum framework? How is our understanding of requirement and design analysis valuable in the Scrum framework? This article describes how these elements flow through Sprints within the Scrum framework.

Requirement analysis is one of the major activities in backlog grooming (the others are estimating and splitting). Once the Product Owner gets an idea by working with customers and adds one vague item into Product Backlog, the item will be groomed for the first time. Considering priority, this item and other smaller items are groomed through several rounds while the Team gets ready for Sprint Planning. The clarity of the items advances in each round of grooming. Acceptance criteria may be drafted in the grooming rounds before Sprint Planning. In the first part of the Sprint Planning Meeting, the requirement analysis continues. If you are able to continuously groom properly, the requirements will be well understood by that time. However, since items are selected in the Sprint Planning Meeting, only then is the Team sure that they are working on them. The Team normally identifies further points (e.g. exact scope, sad path scenario) to be clarified. This may be conducted by working out more details in the acceptance tests. The requirement analysis activity does not stop in the first part of the Sprint Planning Meeting, but continues in the second part and during the actual Sprint. In the second part of the Sprint Planning Meeting, while you are decomposing tasks, the ambiguity in requirement may surface again and be clarified. During the Sprint, test case design, modeling workshop, requirement discussion while designing and coding, and discovery from exploratory testing all contain some element of requirement analysis. Even in the Sprint Review, you will see requirement analysis activity through feedback and suggestion for improvement (new items).

When do we start design? Traditionally, we start design to move from problem domain to solution domain immediately once we get big Product Backlog items. This early move reduces the flexibility in terms of prioritization, which is not recommended in Agile development. We continue to work in the problem domain by keeping the customer orientation as much as possible while splitting the items. The splitting in the problem domain happens in backlog grooming. We also estimate the size of items in backlog grooming. Sometimes, you will have difficulty in estimating the item size, which may be caused by either vague requirements or a lack of experience. If the requirements are vague, requirement analysis in further rounds of grooming helps. If the solution is unknown, architecture or a design spike item can be added in the Product Backlog. This item is normally time-boxed, and its done criteria differ from those of normal backlog items. The output is the sufficient understanding to enable your estimating and planning. In the context of multiple teams working on the same code base, a joint design workshop may be conducted to synchronize the design across teams. In the second part of the Sprint Planning Meeting, the Team commits how much to do in the coming Sprint. In order to make the commitment, the Team normally makes the detailed plan by decomposing items into tasks and estimating those tasks. The commitment may be made based on velocity, but the Team may still think of tasks necessary for them to get the committed items done. How do you determine the tasks? You design. In the second part of Spring Planning, some teams jump into the task decomposition, and get a similar list of tasks such as design, coding, unit testing, review, and functional testing. This indicates a lack of design. How much design do we do in the Sprint Planning Meeting? It needs to be sufficient to support planning. The purpose of Sprint Planning is not design, even though there is a design element in the planning meeting. Besides, the planning meeting is constrained by a time-box, so the Team must find a way to make the best of the time. Design continues in the Sprint. The Team may organize a design workshop, or have an ad-hoc modeling discussion while coding, and coding itself is design. Our design is considered done when the item is done.

In conclusion, you can see the value of requirement understanding and design in the following Scrum activities (major ones in bold).

Requirement: backlog grooming (several rounds) -> Sprint Planning part 1 -> Sprint Planning part 2 -> Sprint -> done -> sprint review

Design: backlog grooming -> spike item (when necessary) -> Sprint Planning part 2 -> Sprint -> done

This flow allows for requirement analysis and design within the Scrum framework.

Tuesday, March 29, 2011

Scrum In A Nutshel

By Dan Rawsthorne and Douglas E. Shimp

Scrum is about Teams producing Results in an agile way. Scrum Teams achieve results anyway they can by using a simple set of rules to guide effort. We will describe Scrum as a simple applied model so that a central understanding of Scrum can be built. Other complexities of applied Scrum such as scaling, distribution, etc. will be explored elsewhere.

The Team

The fundamental element of Scrum is the Scrum Team (or "Team"), which is a small (usually fewer than ten) group of people that provides useful Results/Products for Stakeholders.

Online Scrum Team

Arguably, the most important role involved in Scrum is the Stakeholder, as the Stakeholders are the ones who have desires, wants, and needs, and are the reason the Team is developing the software in the first place. Often, there is a special Stakeholder called the Business Owner, who actually controls the budget for the Team. The Business Owner is often the one who called or asked the Team to form.

While the Stakeholders are the most important source of validation for the project, the most important person on the Scrum Team is the Product Owner (PO). The Product Owner works with the Stakeholders, represents their interests to the Team, and is the first person held accountable for the Team’s success. The Product Owner must find a result that will satisfy the Stakeholders’ needs and desires. The Product Owner provides direction and goals for the Team, and prioritizes what will be done.

The Scrum Team Members, including the Product Owner, are the people who actually do the work that satisfies the goals and priorities the Product Owner has set for them. The Product Owner must work with the Team to find a rate and direction that the Team can go, to achieve a desirable result. Each Team Member is accountable to the rest of the Team for his/her performance, even as the Product Owner is accountable to the Stakeholders for the Team’s performance. The Scrum Team is cross-functional; that is, people on the Team (collectively) have all the skills necessary to do the work (analysis, design, code, test, documentation, marketing plan, drawings; whatever is required for the desired outcome). The Team is self-organizing, self-managing, and constantly trying to improve; they work on the priorities the Product Owner has set. The Team Members commit to the amount of work they can do without undue influence from the Product Owner.

In order to aid the Team (Product Owner included) in doing its work, there is a role on the Team called the ScrumMaster (SM). The SM's responsibilities are to be a facilitator, moderator, and coach, with particular emphasis on helping the Team mature its self-organization and management. The ScrumMaster manages the relationship between the Product Owner and the rest of the Team, and facilitates removal of impediments for the Team, often working with the Product Owner, the Business Owner, and other Stakeholders to do so. Impediments can come from within the Team and outside the Team. The ScrumMaster understands the Scrum process and how the Team is using it, recommends process improvements, and assures that the Team is following the process they have agreed to. If the Team does not follow its process this becomes an impediment. Most impediments can be addressed by simply causing them to become a center of focus. The SM stimulates that center focus by calling attention to the impediment. Creating a smart center of focus is the art of being a SM.

The Backlog

A Scrum Team's work is managed with a Product Backlog ("Backlog"), which is a prioritized list of Product Backlog Items ("PBIs," "Backlog Items,” or simply "Items"). When the list is small it is just a straight list of things, but as it grows we add grouping mechanisms to organize many little things and help us keep track.

Scrum backlog tool

These Items represent the Stakeholder's needs and wants – each of them is a request for something of value from the Scrum Team. These requests can be for anything, including software functionality, marketing, non-functional requirements, technical and infrastructure requests, business support, maintenance of existing systems, and so on. It is a rule of Scrum that the Team shouldn't do anything for any Stakeholder unless it's on the Backlog. The Team will be actively working on the top few Items of the Backlog during the Sprint; this part of the Backlog is called the Sprint Backlog, which is often thought of as a separate list of its own. The Product Owner is responsible for prioritizing that Backlog and thus, creating a distinction between the Sprint Backlog and Product Backlog. From the Team’s perspective, the Product Backlog is work that we might do some day, and the Sprint Backlog is work we are committed to doing.

The Backlog contains Items at all levels of fidelity, from vague wishes/wants/needs to finely detailed requirements. The higher the priority of the Item, the more detailed the request should be, so that it will be ready for planning and execution. Note: “ready” does not imply excessive detail but, instead refers to enough detail. The Team working with the PO will determine what “enough detail” is.

When a Scrum Project starts, the Product Owner should initiate the Backlog by working with the Stakeholders and other Team Members and capturing their needs, wants, and requirements as Backlog Items. As the Project progresses, the Product Owner and the Scrum Team should continuously work with the Stakeholders to (re)prioritize the Backlog, identify new Backlog Items, eliminate noise, and refine and generally clean the items list to get it ready for planning. The project effort will result in product that will often clarify and identify Backlog Items. This process is called Backlog Grooming, and is a continuous process throughout the Project.

Now that we have the notion of the Backlog to work with, let's describe the process, which involves discussion of both Releases and Sprints.

The Release

The goal of a Scrum Team is to produce and release results that meet the goals and priorities that have been set down by the Product Owner (hopefully as a result of working with Stakeholders).

Typically, before a project formally begins, there is a Visioning phase (this could also be the first phase in a project), when the Business Owner, Product Owner, and the Stakeholders produce a Product Vision and a Product Roadmap. The Vision provides the overall focus for the Project, while the Roadmap gives guidance about Releases and their Goals.

The Scrum Team’s purpose is to create a result that satisfies the Stakeholders’ needs, wants and desires, often so that more demand for their services is generated. This production is done through a series of relatively short, fixed-length iterations, called Sprints, in which results are produced by working on Items. The Sprint length can vary, but this requires more discipline on the part of the Team and is not advisable for new, less mature teams. The steps of a Release are relatively simple, and I'll describe them here.

Scrum tool release planning

Usually, the first thing that happens in a release is Release Planning. The Stakeholders, the Product Owner, and possibly other members of the Team, get together and negotiate what will be accomplished in the Release. This negotiation considers the Product Vision and Roadmap, balances the needs and wants of the Stakeholders against the abilities of the Scrum Team, and results in a set of Release Goals and a Release

Strategy to achieve them. The Product Owner and Team must update the Backlog so that there are prioritized Items on the Backlog that support the Release Goals and Strategy and are ready for planning.

Once we have a Backlog that supports the Release Goals and Strategy, the Team starts sprinting. The idea is for the Team to do as many Sprints as the Release Strategy calls for, and then Release the Results. Each Sprint looks basically the same, with the Release activities as part of the last one.

The Sprint

The fundamental process flow of Scrum is the Sprint, which is a relatively short period of time in which Backlog Items are converted into Results.

Scrum Sprint Tool

The first thing to do in a Sprint is Sprint Planning. In Sprint Planning the Product Owner works with the Team to negotiate what Backlog Items the Team will commit to for the Sprint in order to support the Release Goals and Strategy. Each of these Items has an agreed-upon definition of "Done," and collectively these Items are called the Team's Sprint Backlog. It is the ScrumMaster’s responsibility to ensure that the Team commits to a realistic amount of work, and that the Product Owner does not unduly influence this commitment. Often, the Items on the Sprint Backlog are tasked out in order to give the Team confidence that it can complete the Item, and thus commit to it. The tasking of Items can help the Team mature by paying attention to the work agreements they make with each other. The tasking can also help the SM detect when the Team is working well.

Once Sprint Planning is over, the Team begins work in the Sprint. The Team self-organizes to do the work and self-manages as it does the work. The Team’s work pattern is described as a swarm to get the job done. Team swarm is a pattern of performing Teams that looks like a swarm to an observer. While the Sprint is in progress, the Team will have Daily Scrums in order that each Team Member understands what the Team's status is. This allows the Team to detect when to adjust in order to be as effective and efficient as possible. These adjustments often take significant time and occur after the Daily Scrum.

During the Daily Scrum, and continuously throughout the day, the Team Members notify the ScrumMaster of any impediments they encounter. It is the ScrumMaster’s responsibility to facilitate the removal of these impediments. Often, this requires working with Team Members, the PO, the Business Owner, and other Stakeholders.

The ScrumMaster must also ensure that the Team does enough Backlog Grooming in order to be prepared for the next Sprint's planning meeting. The Backlog Grooming is a strategy to prepare enough work to begin next so that a rhythmic flow of work can happen.

When the Sprint is over there is a Sprint Review, when the Product Owner and the Team show the Team's Results to their Stakeholders. This is done for two reasons: to prove to the Stakeholders that the Team is moving in the right direction, and so the Team can get feedback on what they've done. If necessary, the Release Goals, Release Strategy, and Backlog are updated as part of the Review (or soon thereafter), considering the Review and any "business reality" changes the Stakeholders may have. When Teams are small they can rely on more intuitive reasoning to determine what the "right direction" is. As a Team grows they will see a need for more sophisticated techniques that use metrics to help them answer what the "right direction" is.

After the Sprint Review, the Team has an internal retrospective to analyze its performance and process. The Team decides what changes, if any, they wish to make to their process as a result of this analysis. These changes will be "enforced" by the ScrumMaster in future Sprints. To enforce something the SM will need to shift the focus to the issue at hand and then let the Team react. Telling the Team what to do is not desirable. Shifting the Team focus and thereby enforcing change is an art of the SM.

At this point the Sprint is complete, and the Team either begins the next Sprint, the next Release, the next Project, or disbands, as appropriate.

Quick Summary

Team of 7±2 does the work
PO provides the work requests
SM provides care for the whole team (PO/Team)
Team swarms on the work
Team is cross-functional
Team owns its process
PO provides validation for each work request
Work is done in short bursts < 30 days each (Sprints)
Work starts and stops with Planning and Review
Review demo for product; Review retro for process
Daily Scrum detects any adjustments needed
PO determines priority as a flow of work requests
SM observes and helps the whole team adjust
SM tunes the whole team for maximum performance

Sunday, March 27, 2011

Manager 2.0: The Role of the Manager in Scrum

By Pete Deemer

When an organization starts to explore Scrum, there’s often an uncomfortable moment early on when someone points out that the role of "manager" seems to be missing entirely. "Well I guess we’ll have to just get rid of ‘em all!" wisecracks one of the developers, and all the managers in the room shift uncomfortably in their seats.

Scrum defines just three roles – Product Owner, Team, and ScrumMaster – and the basic direction given to others in the organization is to "support them, or get out of their way." This is not very detailed advice, especially if you’re a manager expected by senior management to ensure everything goes well.

The traditional role of the manager in the corporate world is based on a model known as "command and control." Here, the job of the manager is to identify what needs to be done, to issue detailed instructions to the employee, and then to ensure the employee completes the work according to the instructions. The role of the employee in this model is simply to follow the directions as given, trusting the judgment and wisdom of the manager to ensure that the right work is being done in the right way.

In complex, dynamic environments such as software development, this approach tends to break down. First, it is difficult and time-consuming for a manager to understand every requirement in full detail and issue precise instructions to guide the work of every employee. Within a software development Team, the work is highly interconnected, with intricate dependencies, and frequent change and surprise. To expect a single manager to do all the basic thinking for his or her team is unrealistic, and it often constrains the Team’s productivity to the manager’s ability to give instructions. In addition, this approach tends to be demoralizing for employees; their role is simply that of "order follower," and they often feel little sense of ownership of their work. Accountability is limited to answering the simple question, "did I complete the orders I was given?" If the answer is "yes," the job has been done – regardless of whether the right thing was built, built well, or built to satisfy the business goals of the customer.

Scrum is based on a different approach: The Self-Organizing Team. The difference is apparent from the first steps the Team takes. In Scrum, the Team decides how much work to commit to in a Sprint. Experience has shown that when Teams themselves decide how much to commit to – and when this commitment is realistic and achievable – the Team’s focus, motivation, and drive is significantly higher, and they produce better results. When managers first learn of this practice, they often voice the concern, "What if the Team under-commits?" This is typically not a problem, since the process of deciding the commitment is very transparent and open. Indeed, it’s much more common in the early Sprints for Teams to significantly over-commit; most Teams have very little experience doing their own estimation, and it takes a number of Sprints before their optimism is tempered by experience. Moreover, in the event the Team does wind up under-committing, they will either finish the Sprint early, or they will start work on the next item on the Product Backlog. No harm, no foul.

Team Tango had just completed their first Sprint Planning Meeting, for a two-week Sprint. They brought in their manager, Jason, and walked him through the work they'd decided to commit to in the Sprint.
Finally, they asked Jason, "Is this a good amount to commit to?"
Jason turned the question around to the Team:

"Do you truly believe you can finish this work, at a high level of quality, by the end of the Sprint? Do you really feel committed?"

The Team members all nodded to him, looking quite convinced.

"Then it's a good amount to commit to," Jason replied. "And if it turns out to be too much or too little, you'll know two weeks from now, and you'll have learned something about how much you should commit to in the following Sprint".

The next aspect of self-organization happens during the Sprint, when the Team works together closely to decide who will perform which tasks and to make sure all the work is completed. When the Team is responsible for this decision-making, they remain focused on the fact that they own the commitment – and if the commitment is to be completed, they are the ones who must do it. When someone outside the Team is responsible for deciding what needs to be done and by whom – for example, a manager – the Team receives a subtle but real signal that they are not responsible: it’s the manager’s job to worry about how to meet the commitment, not the Team’s. This does not mean that managers are not providing support during the Sprint – on the contrary – but managers are careful not to send any signal to the Team that would reduce their sense of ownership of the goal, or responsibility for managing themselves during the Sprint.

On the first day of their first Sprint, the Team called their manager Sanjay over to join them for their Daily Scrum Meeting. Sanjay, wanting to be helpful, agreed to the request. He stood just outside the circle as the Team gave their reports to each other. Sanjay noticed that people seemed to be emphasizing how much they got done the day before, and weren't spending very much time reporting the blocks they were hitting. And after each person gave their short report, they looked over to Sanjay expectantly, hoping to catch a glance of approval. By the end of the Daily Scrum, Sanjay noticed that the entire circle of people had shifted, so they were now facing him.

After the last report was given, a Team member raised his hand, and asked "Sanjay, do you have any feedback or guidance for us?"

Sanjay knew that he had to take action.

"Guys, I'm really concerned. I feel like this meeting was for my benefit. I feel like you‟re still looking to me to make sure everyone's doing the right thing. Here's the deal: I'll give you any help you need, at any point in the Sprint. If you hit a block and you're not able to resolve it, I'm here to provide any assistance I can. But at the end of the day, you are responsible for doing what's necessary to meet the commitment you've made. So from now on, I'm not going to join this meeting. This is your meeting, to manage yourselves, to meet your commitment. If I'm here, I'm afraid I'm just going to undermine that."

The Team was silent. Then Victor, a Team-member, spoke up.

"So let me get this straight. We are the ones responsible here? We really do own this…?"

A subtle jolt of realization passed through the Team, and at that moment, they took their first step towards truly becoming a self-organizing Team.

One of the biggest challenges in successfully making the transition to self-organization is that the Team will not begin to self-organize until everyone outside the Team stops micromanaging them. Teams are so conditioned to follow orders that they will often not begin to self-organize until there are no orders available to follow. This requires a leap of faith for the manager, and it can be scary. This is not to say that the manager abandons their Team – rather, the manager needs to change their style of interaction, and constantly signal to the Team that they are now the ones responsible.

Eileen was an Engineering Manager at RedAlpha Systems, working with a Team of seven relatively junior developers. During the first Sprint Planning Meeting, she sat at the back of the room working on e-mail, as the Team completed the task breakdown for a big feature at the top of the Product Backlog.

When they finished, they turned to Eileen and said "How does this look to you?"

Eileen could see immediately that the Team had overlooked several important database tasks. It would be very simple for her to simply point out the tasks they’d overlooked, and the problem would be solved. Or would it?

Eileen decided to try a different approach. She stood up and announced, "Guys, you've done a pretty good job, but you're not quite done. There are a couple important tasks that you've overlooked. I'm not going to tell you what they are. But I will give you a hint: think more carefully about the user session data. Now I'm going to go and grab a cup of coffee, and I'll be back in about 5 minutes. See if you can figure it out before I get back."

And at that, Eileen strode out of the room.

The Team looked at each other, slightly bewildered. Eileen had always been quick to point out what they'd missed; they depended on her for that. But this time, she was making them figure it out. They stood in silence for a moment at the whiteboard, then slowly discussion began. They went through task by task, looking at each from different angles. Then, after a few minutes of discussion, Tony spoke up.

"Wait a minute… where are we going to store the user session data? We‟re going to have to set up a new table in the database for that, right?" There was a round of forehead slaps from the other Team-members.

"Of course! How did we miss that!" several people murmured. There was a chuckle of embarrassment, and Sam started writing yellow Post-It Notes for each of these new tasks and putting them on the white-board. A few minutes later, Eileen returned with her cup of coffee. She looked at the white board, and nodded in agreement.

"Good job, guys. Now why don't you all continue with your meeting, I've got a bunch more e-mails I need to get through."

Eileen sat back at the end of the table, satisfied that she'd done her job well.

In this example, it would have been faster and easier for Eileen simply to tell the Team what to do. But had she done that, she would have encouraged them to wait for solutions from her, and not think for themselves. Instead, Eileen did something harder, but ultimately much more valuable: she placed the responsibility on the shoulders of the Team to figure out what they had forgotten, and provided just enough help to enable them to get it done. Had Eileen returned to find the Team still struggling, she could have provided another hint or asked another probing question, and continued to do so until the Team finally figured out the missing tasks. Eileen could even have let the Team proceed, and discover their oversight during the Sprint; mistakes often produce the most powerful learning experiences.

In simplest terms, the manager in Scrum is less of a "nanny" for the Team and more of a mentor or "guru," helping them learn, grow and perform. This is the shift from "Manager 1.0" to "Manager 2.0."

In order for managers to be effective in this new mode, the organization must redefine the role and expectations of the manager. For example, in Scrum, the Team is responsible for completing their commitment in the Sprint, and for this to work, it must be clear to all that the manager is not responsible for this. Similarly, in Scrum, it is the Product Owner’s responsibility to deliver the release on schedule, not the responsibility of engineering management, and the organization needs to make clear to everyone that this is the case. Problems occur when the organization “talks the talk” on the new role of the manager, but does not “walk the walk” when things get difficult.

The Galaxy Team had been doing Scrum for several months, and the Team was well on its way to being truly self-organizing. Their motivation was high, they were focused, and after a few Sprints of under-delivery, they were now showing a pattern of making reasonable commitments and delivering those 100% each Sprint. Morale was high, and there was a real sense of “flow” in the work they were doing. The engineering manager Francis had come a long way – once a habitual micromanager, he was now acting like much more of a mentor and coach for the Team. Unfortunately, though, in the eighth Sprint, the Team encountered some unexpected difficulties, and about halfway through the Sprint, they were significantly behind in their progress. The VP of the group, Simon, had ventured into the Team’s work area to see their Sprint Burndown Chart, and called Francis to his office.

"Francis, it looks like this Sprint is a disaster. What’s going on?" he asked.

Francis responded, "Well, the Team hit some bumps along the way, and they're trying hard to get everything done that they committed to, but it's a bit touch-and-go right now."

Simon grimaced.

"Francis, this project is critical, and we can't let it fall behind. I'm counting on you to make sure the Team finishes what they commit to, this Sprint and every Sprint. As a manager, your job is to make sure the Team gets it done; if things are going well, then you can back off a bit, but the minute the going gets tough, I want you in there making sure that no time is being wasted, and everyone is doing exactly what needs to be done."

Francis was exasperated. Simon had been too busy to attend the in-house Scrum trainings, but Francis had emailed him a PowerPoint presentation about self-organizing Teams and the new role of the manager, and Simon hadn't voiced any disagreement. Francis spoke up:

"But what about the self-organizing Team, Simon? What about our shift away from micromanagement?"

There was a glimmer of recognition, as Simon recalled a PowerPoint he'd seen a few months before.
"Yes, the Team is responsible, but when they start to fail, I hold you responsible. We want maximum accountability, so I'm holding them accountable and I'm holding you accountable. In our department, everyone is accountable! Now make it happen."

At that, Simon spun his chair around and started typing. Francis took the hint and left the office.

The next day, Francis showed up at the Daily Scrum Meeting.

"Guys, we're going to do a different format for the meeting today. Due to the criticality of this project, Simon has instructed me to more actively… uhhh…, facilitate' your self-organization during the Sprint. So what I'd like to do this morning is get a status update on each of the features you've committed to – whose done what so far, and what's left to be done – and I'm going to be giving some more detailed feedback so hopefully we can get everything 100% finished by the end of next week."

The Team looked at each other. Philip, the ScrumMaster of the Team, spoke up. "Francis… uhhh… does this mean that the Team is no longer responsible for managing itself?"

Several Team members nodded in agreement.

Francis replied, "Guys, we're all responsible. You're responsible for managing yourselves, and I'm responsible for making sure you get everything done. We're all responsible together!" Francis didn't see the eyeballs subtly roll.
As the Sprint proceeded, Francis was more and more involved. The Daily Scrum became an update meeting for the Team to tell Francis what they'd been able to complete, and for him to assign them the next day's tasks. The mood of the Team shifted; motivation seemed to go down, and Team members seemed to be reverting to their previous role, what they used to sarcastically call "servants-of-Francis-the-Great." By the end of the Sprint, the Team was fully back into "order-following" mode, and Francis was directing their efforts task-by-task.

At the Sprint Review, the Team was surprised when Simon joined the meeting just as it was starting.
"So…" Simon announced, "Did we get our commitment done?"

The Team looked at each other. Francis answered.
"Simon, unfortunately there are a couple backlog items that weren‟t finished." There was a flash of anger in Simon's eyes.

"How did this happen? Who is responsible for this?" The Team was silent, but their heads all turned slowly to Francis.
Simon continued. "Francis, I told you to get it done. Next Sprint, I don't want to see this happen again. If it does, there will be hell to pay…"

Upon hearing this, everyone on the Team made a mental note to think very carefully about just how much to commit to in the next Sprint. The last thing they wanted was to get shouted at again two weeks from now.
As the Sprints passed, Francis became more and more involved in directing the Team at every stage of their work. Gone was any semblance of self-organization, and with it disappeared the improved motivation, drive, and focus that the Team had started to display. Morale had plummeted, and so too had productivity. Lunch breaks were getting longer, coffee-breaks more frequent, and Francis felt like he was spending more and more of his time just making sure people were at their desks working. Those amazing few Sprints, when the Team was truly self-organizing, and performing at the level they were really capable of, were becoming more and more of a distant memory. The return to micromanagement was made all the worse because they'd had a taste of the self-organization "good life."

here were errors of judgment at every step of this situation. The ScrumMaster didn’t protect the Team from Francis’s micromanagement, or call Francis on the "double-talk." Francis didn’t make any effort to reason with Simon, or help him see the consequences of his actions. But perhaps the biggest mistake was an early mistake: Simon was never properly educated about the shift in the management model that Scrum requires to be successful, and how this applies not only in good times but also when the going gets tough; and this shift was never made "official" in the form of a change to Francis’s job description. And as a result, a successful, high-performance Scrum Team rapidly deteriorated back to its previous under-performing state.

The above scenario is extremely common and is a frequent point of failure for Scrum transitions. Furthermore, in an organization where this scenario plays out, word spreads very quickly, often causing other managers to proactively return to micro-management as a self-protective measure.

So how does one prevent this kind of failure from occurring?

First, one has to make a clear-eyed assessment of management’s willingness and ability to change, at every level. If there exists a fundamental belief in the effectiveness of the "command and control" approach within the management and executive ranks, and a heavy dependence on intimidation, threats, or punishment (such as shaming or humiliation) as a management tool, it is going to be particularly difficult to make the transition to a new way of thinking. As a result, an adoption of Scrum risks being incomplete and dysfunctional, producing little if any improvement for the organization.

However, if there is an openness to change, and a recognition that the existing command and control habits may possibly not be the most effective approach, then there needs to be education and coaching at every level of management; in practice, this means high-quality Scrum training for all managers, from the lowest functional manager all the way up to the senior (VP-level and above) members of the organization.

The final necessary step for completing this redefinition of the role of the manager is to “make it official” within the organization. One option is to use the pre-written job description included below as guide. The other option is to complete the interactive exercise that follows with managers in the organization, to break down their existing job descriptions and rebuild them to be compatible with Scrum values and practices. With either of these approaches, it is critical to get formal approval of the manager’s new job description from his or her manager (for example, the Engineering Director, or department head). Without a clear, "official" approval from senior management, the manager’s new role will be more difficult to protect when difficulties arise.

THE MANAGER AS SCRUMMASTER

Another approach to redefining the role of the manager is to convert them into the ScrumMaster for their Team. This has a poor track record of success. When the manager plays the role of ScrumMaster, it’s highly unlikely the Team will ever begin to self-organize. The previous habits of "order-giver" and "order-follower" are very difficult to break, and what will likely happen instead is that pre-existing command-and-control values and patterns will be transplanted into the heart of the Scrum practices. As a result, the benefits that flow from a self-organizing Team – ownership, focus, drive, pride in quality, improved morale, and better productivity –will likely not be realized. It would be better in most cases to have a Team-member play the role of ScrumMaster, even if they must do this in parallel with development responsibilities.

HANDS-ON: REDEFINING THE MANAGER’S ROLE

People needed: Manager, Exercise Facilitator

Step 1. Ask the manager to write down all of their current job responsibilities on Post-It Notes. The manager should try to be as comprehensive and complete as possible, including both official and unofficial responsibilities and things they should be doing but haven’t had time to do. Most managers should be able to come up with at least 20-25 items. Here’s a sample list:

Free Scrum Tool

Step 2. Draw two columns on the whiteboard: "Fine in Scrum" and "Conflicts with Scrum / Not Needed in Scrum." Ask the manager to go through the Post-It notes one by one, and place them in one column or the other.

Online Scrum Tool

Step 3. Take all the items in the “Fine in Scrum” column, and turn them into a new job description for the manager. (Getting help from HR may be useful at this stage.)

Step 4. Ask the manager, "Will you be more useful or less useful to the organization in this new role?" and “Will this role be more interesting or less interesting for you to do?" In most cases, the immediate response will be "more useful" and "more interesting."

Step 5. Get formal approval of the manager’s new job description from his or her manager (for example, the Engineering Director, or department head). This is a critically important final step. Without formal agreement, the manager’s new role will not be considered "official," and there will be an even greater risk of falling back into prior patterns of micromanagement and command and control.

EXPLANATION

Fine in Scrum

1. Help remove blocks that the Team is not able to resolve by themselves While the ScrumMaster does this hour-to-hour / day-to-day, managers will need to focus on removing more systemic or companywide blocks. These are often the most vexing problems in the organization, and will require the management’s influence, authority, or spending power to overcome. In The Enterprise and Scrum, Ken Schwaber recommends creating an enterprise transition team of managers and executives who are responsible for evolving the organization based on a backlog of impediments.

2. Provide advice and input to the Team on technical difficulties that come up Managers should be available to give advice or assistance whenever the Team asks for it.

3. Do regular 1:1 meetings with Team-members, to provide coaching and mentoring. Managers should spend 1:1 time with Team-members, at a frequency that feels right. This is not a task update meeting – this is time for coaching and mentorship. Some managers like to do this sitting side-by-side, writing code!

4. Give input on how to make features better.
This input goes directly to the Product Owner, typically during the Sprint Review.

5. Stay abreast of developments in tools, technologies, and techniques the Team is using.
A very important and often neglected activity. Managers are can sometimes be "frozen in time" at the technology and development practices that were current when they were last doing actual development themselves.

6. Plan training and other skills development for Team-members.
Managers should think carefully about areas where the Team’s skills could use development, or capabilities the Team will need to have to handle upcoming Product Backlog items.

7. Stay up to date on industry news and developments.
Again, an important and often neglected activity.

8. Anticipate tools, skills and other future needs.
Another important and often neglected activity. Be sure to get input from the Team.

9. Plan and manage budgets and financials.
Another important and often neglected activity. Be sure to get input from the Team.

10. Give input on what features / functionality the Team should build.
This input goes directly to the Product Owner.

11. Do performance evaluations and provide feedback to Team-members.
This is a necessity within most organizations (despite well-documented flaws in the methodologies typically used). Managers should base their evaluations on their own observations and well as on feedback from the employees’ fellow Team-members.

12. Do career-development and career planning with Team-members Career.
opportunities are one of the most significant valuable forms of compensation people receive from their employer.

13. Recruit, interview and hire new Team-members.
Some of the best – and in other cases, worst – management actions are hiring decisions. Great hires pay dividends every single day they are employed – and poor hires are an invisible daily “tax” on the Team’s ability to deliver business value.

14. Remove Team-members who are not able to perform well within the Team.
If even after extensive coaching a Team-member is not able to contribute, work harmoniously with other Team-members, or perform at the level required, they may need to be moved off the Team, or out of the organization. Typically managers will need to guide this process, in coordination with HR.

Conflicts with Scrum or Not Needed in Scrum

15. Decide what work needs to be done.
The Product Owner decides the features and functionality that needs to be built, and the Team determines what tasks are necessary to deliver this.

16. Assign the work to Team members.
The Team does this itself, during the Sprint.

17. Keep track of what everyone on the Team is doing
The Team does this, using the Daily Scrum Meeting and the Sprint Backlog.

18. Make sure the Team gets their work done.
The Team is responsible for this.

19. Make commitments to management about how much Team can do by a certain date.
The Product Owner measures or estimates the Team’s velocity, and makes forecasts of how much of the Product Backlog the Team can complete by a specified date. If the Product Owner makes a hard-date release commitment, the Product Owner is responsible for including the necessary scope and schedule buffer to achieve it.

20. Be responsible for the Team meeting the commitments I’ve made to management.
The Product Owner is responsible for making decisions about what to do if velocity is lower than anticipated – either moving the release date, removing Product Backlog items, or simplifying Product Backlog items.

21. Do weekly status update report for management.
Not needed in Scrum. If management wants to know how the project is going, they ask the Product Owner for the Release Burndown chart.

22. Do weekly Team staff meeting.
Not needed in Scrum. The Team updates each other daily, and managers can get an update on the Sprint in the Sprint Review Meeting.

HANDS-ON: SAMPLE JOB DESCRIPTION FOR MANAGER

  • Lead the recruitment and hiring of new Team-members (with the active involvement and input of the existing Team-members)
  • Provide input to the Product Owner on the product strategy and vision, and give feedback to the Product Owner on the content and prioritization of the Product Backlog.
  • Provide support and assistance to Teams and their ScrumMasters. Be prompt and proactive in helping remove impediments that are harming Teams’ ability to be effective.
  • Actively support ScrumMasters’ efforts to protect Teams from disturbance, disruption, or outside interference.
  • Be available to provide advice and assistance to Teams on technical difficulties that arise in the course of doing their work.
  • Identify issues to Teams that they might overlook, such as scalability, performance, security, etc.
  • Provide mentorship and career development advice and guidance to Team-members. This mentorship should include technical mentorship, as well as soft-skills and other aspects of being effective and successful in a development organization.
  • Plan and manage skills development and training for Team-members. Think carefully about areas where their skills need greatest development, or where the most opportunity for improvement exists; work with the person to identify appropriate training; and obtain budget and time allowance to complete it.
  • Stay abreast of developments in the tools and technologies that Teams are using. Solicit input from Teams and other stakeholders on tools and technologies that could be useful. Spend time getting hands-on familiarity with these tools and technologies.
  • Stay up to date on industry news. Be knowledgeable about developments from our company, our competitors, and our largest customers, including financial performance, marketshare, product roadmap, and overall business strategy.
  • Remove Team-members that are not able to perform well within a given Team, work effectively with their fellow Team-members, or perform work at the level of expertise or quality required. This should come only after coaching and training has failed to correct the under-performance.
  • Do financial planning and budgeting for Teams, including anticipating future people requirements, skills development and training needs, tools and technologies required, hardware, travel, and any other resources that people will require.
  • Provide performance feedback and complete performance evaluations for Team-members. Informal performance feedback should be provided on a frequent basis, and should include feedback from fellow Team-members. Feedback should be focused on recognition for achievement, and opportunities for growth.